Assembly Line
From the time a hull is removed from its mold to the time the finished yacht is rolled out the door to be prepared for shipping, it will have traveled on more than 6 km's of railway system.
The hulls and decks are all timed to be produced and assembled in different halls before coming together at precisely the same moment, ready to be assembled along with the rest of the yacht.
Truly, an impressive display of timeliness. With quality control checks at every station, the margin for error is dimished.
Flow of installation:
- furniture installation
- glass in furniture
- top coat sealing
- water system 1
- electric installation 1
- hull/deck joint
- water supply 2
- electric installation 2
- finish of installation
- keel/rudder mounting
- basic cleaning
- initial quality control
- possible refinish
- floor/table mounting
- final fitting of "added options"
- quality control of systems (engine/electric systems/water supply)
- final quality control